14 September 2009: Titanium Resources Group ("TRG" or "the Company") announces its interim results for the six months ended 30 June 2009 ("the Period"). 

Highlights

·         Total sales of US$19.8 million (H1 2008 US$ 23.5 million1)

·         Costs of sales decreased by more than 50% to US$20.75 million (H1 2008 US$43.58 million2)

·         Loss after tax of US$ 4.95 million (H1 2008 loss after tax of US$ 20.2 million)

·         New power plant and lower oil prices contributed to  total reduction in fuel costs of US$ 9.9 million 

·         A gross insurance settlement of US$ 3.5 million was received from a reinsurer, following the capsize of Dredge D2

·         Comparable rutile production of 31,418 tonnes in the Period (H1 2008 35,419 tonnes3)

·         Cash generated from operations of US$ 2.4 million (H1 2008 loss of US$ 2.9 million)

·         Operating loss of US$ 959,000 (H1 2008 loss of US$ 11.1 million)

·         Force majeure lifted on supply contracts and 2009 production fully sold.

1 Excluding US$ 9 million of Bauxite sales in H1 2008. Total sales for H1 2008 were US$ 32.5 million

2 H1 2008 included US$ 8.1 million cost of sales from SML bauxite mine (Disposed July 2008)

3 Excluding 7,523 tonnes from D2 in H1 08. Total rutile production in H1 2008 was 42,942 tonnes.

 

Commenting on the results, TRG Chief Executive John Sisay said:

"The Company has made significant progress during the first half of 2009 and, whilst challenges remain, I am confident that our performance will continue to improve in the second half of the year."

"The completed commissioning of the new power plant at Sierra Rutile and the implementation of a number of other cost saving measures have enabled us to significantly reduce operating costs in the Period. TRG's costs of sales have fallen by more than 50% compared to a year ago and operating losses have narrowed by 91% over the same period. As a result we believe the Company is on track to achieve operating profitability for H2 2009."

"The Company has fully sold under contract all production for 2009 as well as almost all production for 2010.  We are confident that demand for our product significantly exceeds our current production capacity"

TRG

John Sisay, Chief Executive

Walter Kansteiner, Non-executive Chairman

Tel: +44 (0) 207 321 0000

Nominated Adviser

Arbuthnot Securities

John Prior / Ed Burbidge

Tel: +44 (0) 20 7012 2000

Aura Financial

Michael Oke / Andy Mills

Tel: +44 (0) 207 321 0000

Chief Executive's Review

The Company has made significant progress during the first half of 2009 and, whilst challenges remain, I am confident that our performance will continue to improve in the second half of the year.

The completed commissioning of the new power plant at Sierra Rutile and the implementation of a number of other cost saving measures have enabled us to significantly reduce operating costs in the Period.  TRG's costs of sales have fallen by more than 50% compared to a year ago and operating losses have narrowed by 91% over the same period.   As a result we believe the Company is on track to achieve operating profitability for H2 2009.

The Company continues to work on long range mine planning and further mine development feasibility studies, in order to maximise the mine life of the reserve.

Production fell by 27% compared to the same Period of 2008, however stripping out the contribution of Dredge D2, production was down by only 11% on a like for like basis. Dredge D1 will be mining higher grade areas of the deposit in the second half of the year with expected grades of approximately 1.8-2% recoverable rutile and as a result we expect an improvement to production volumes. 

In the absence of production from D2, the Company has assessed a variety of options in order to increase production at the Sierra Rutile mine. As a result, the Company now intends to complete the construction of D3 and upgrade certain mineral processing equipment to improve recovery rates as soon as is practicable. In order to initiate these works, the Company will require financing of approximately US$ 25 million. It is anticipated that it will take 1 year before D3 is fully operational, at which time it should be able to deliver an additional production capacity of 30,000 tonnes per annum.  The upgrades to the mineral processing equipment are expected to increase rutile production by approximately 5,000 tonnes per annum.   

Following the lifting of the Company's suspension from trading on AIM in January, and my appointment as Chief Executive in February, we have made a number of changes to the Company's Board and management. Lindberg Charles has been appointed Chief Financial Officer, following a number of years with the Company, François Colette has been appointed as a Non-Executive Director, and Raju Jaddoo has become a Non-Executive Director following his resignation as Chief Financial Officer.  

Following the end of the period, the Company is pleased to announce the appointment of Mark Button as Chief Operating Officer.  Mark has significant experience working in Africa in a variety of geological and management roles, most recently as Regional Geological Resources Manager at Anglo Coal.  We are sure his significant experience in the mining industry will prove invaluable as we seek to develop our operations.  

Dredge D2

The settlement agreement with one of our reinsurers, in April 2009 over claims relating to the capsize of Dredge D2 can now be disclosed as US$3.5 million, and appears in the accounts as an exceptional item.

We continue to negotiate with our insurers over the outstanding claims relating to Dredge D2.  Whilst there can be no certainty about the likely timing for the conclusion of our legal action we believe we are in a strong position based upon the legal and technical merits of our claim.  

As previously stated the project to repair Dredge D2 is expected to take 24 months and cost US$35 million, and we continue to assess a range of options in relation to the rehabilitation of the dredge. 

Production

On a like for like basis rutile production in the Period fell by 11% to 31,418 tonnes compared to the 35,419 tonnes produced by Dredge D1 in the first half of 2008.  The anticipated decline in production was as a result of Dredge D1 moving through lower grade material as it mined the border areas of the higher grade Lanti deposit, unforeseen operational difficulties and lost production hours as a result of bucket changes on the Dredge.  We expect production volumes for the second half of the year to improve now Dredge D1 is mining higher grade areas of the deposit where recoverable rutile grades are between 1.8 and 2%.

Ilmenite production of 8,658 tonnes in the Period, was a decline of 2,065 tonnes compared to H1 2008, following the capsize of Dredge D2.

Financials

The financial performance of the Company in the Period improved significantly with operating losses falling by more than 90% from US$ 11.1 million in the same period of last year to US$ 959,000. Total sales during the Period were US$ 19.8 million, a decline of 16%.  The Company reported a reduced loss after tax of US$ 4.95 million, compared to US$ 20.2 million in the first half of 2008. 

This improved result was principally as a result of a significant decline in the cost of sales, which fell by 52% to US$ 20.7 million.  Reduced overall fuel costs, the sale of the SML bauxite mine in H2 2008, improved procurement processes and reduced expenditure on overheads and salaries all contributed to this highly credible performance. 

Net cash generated from operational activities was US$ 2.3 million, in comparison to a loss of US$ 2.9 million in the first half of 2008.

The exceptional gain of US$ 2.3 million includes the US$ 3.5 million received from the settlement with a reinsurer, less US$1.2 million in legal costs incurred thus far in the Company's continuing pursuit of total insurance monies and the settlement agreement concluded in April.  Whilst legal costs will continue to be incurred we are confident the Company will secure significant additional receipts from the remaining reinsurers.

At 30 June 2009 the Company had cash and cash equivalents of US$ 4.5 million and net debt of US$ 48.2 million.  As previously announced during 2008 the Company successfully negotiated with the Government of Sierra Leone a 2 year moratorium on interest payments on the Company's EU loan.

Cost Reduction

During the first half of the year a combination of reduced oil prices and operating efficiency improvements from the new powerhouse, which operated in line with forecasts, resulted in a total reduction in fuel costs of US$ 9.9 million.

The Company also achieved a reduction in overheads for the Period in excess of US$ 3.7 million, representing 8.5% of the company's total cost base. These savings were driven by the significant measures we have taken to reduce costs across the entire business through headcount reductions, salary cuts, improved procurement processes, and a reduction in contracted services

 

In addition to these cost cutting initiatives, an additional cost saving of US$ 8.1 million was realised as a result of the sale of the SML bauxite mine in July 2008.

Markets & Outlook

Titanium dioxide feedstock markets have been affected by the economic crisis with demand for certain grades of product falling  in the first half of the year, however this has been mitigated by a number of factors which have supported demand for the Company's high grade rutile. As a result, rutile prices were higher in the first half of 2009 than 2008.

Whilst pigment manufacturers have curtailed production and shut plants in response to global economic conditions, supply reductions and plant shut downs across the feedstock industry have more than offset this reduction in production capacity.  

We continue to see increased demand for higher purity titanium feedstocks such as those produced by TRG. This is due to demand from both US, European and Asian chloride pigment manufacturers which we expect to remain robust in the second half of the year. 

Demand for industrial grade rutile remains strong, particularly in Asian markets, with the Company's high grade product able to command a premium.  Demand for industrial grade rutile for use in the welding rod sector grew by 15% in 2008 according to TZMI, and our research indicates that during 2009 it has continued to benefit from the significant infrastructure focussed government stimulus packages across the region.

The Company has also been successful in selling its ilmenite production during the first half of the year and is confident that this position will be maintained in the second half of 2009.

In February the Company lifted force majeure on its supply contracts. The Company has fully sold under contract all production for 2009 as well as almost all current planned production for 2010.  We are confident that demand for our product significantly exceeds our current production capacity.

Whilst the outlook beyond 2010 is unclear given the significant uncertainty over the future growth of the global economy, we are confident that demand for our product will remain solid.  Industry analysts forecast that rutile prices will continue to rise as a result of continued demand combined with a lack of significant new sources of supply. 

HARRY CAMERON

CONSULTANT

AURA FINANCIAL

THE ECONOMIST PLAZA,

7th FLOOR, 27 ST JAMES'S STREET,

LONDON, SW1A 1HA

T: +44 (0)20 7321 0000    D: +44 (0)20 7321 0036

M: +44 (0)7717 678 511   F: +44 (0)20 7022 1678

W:   WWW.AURA-FINANCIAL.COM

This email and its attachments are confidential and intended solely for the use of the individual to whom it is addressed. It may contain private price-sensitive information and may be privileged or otherwise protected from disclosure. Any views or opinions presented are solely those of the author and do not necessarily represent those of Aura. If you are not the intended recipient, be advised that you have received this email in error and that any use, dissemination, forwarding, printing or copying of this email is strictly prohibited. If you have received this email in error please notify Aura by email info@aura-financial.com.

Aura Financial LLP Company number 0C307804


______________________________________________________________________
This email has been scanned by the MessageLabs Email Security System.
For more information please visit http://www.messagelabs.com/email
______________________________________________________________________
Filed under  //   Corporate Council On Africa JR Boulle   Interim Results 2009   JR Boulle Companies   JR Boulle Conservation   JR Boulle Corporations   Jean-Raymond Boulle Corporations   Jean-Raymond Boulle Foundations   Jean-Raymond Boulle council on Africa   Titanium Resources Group   boulle africa   boulle family   boulle foundation   boulle int   boulle j   boulle jrb   boulle mediation   j boulle   j boulle revival sa leone   jean boulle   jean raymond boulle   jean raymond boulle mining   jean-raymond boulle donation   john collier mining legend   jr boulle   jr boulle contribution   jrb boulle  

About

This Boulle Vortal is dedicated to the Members of the Boulle Diaspora who are contributing to or have contributed to human rights, to the environment, to the preservation of wild life, to charitable causes, to mediation and to war and conflict resolution throughout the world.